Before the construction of the installation, the drawings should be well-known, and the construction plan should be prepared for the unique or complicated installation. Master the situation of installing on-site transportation roads, switching power supplies, etc. On-site roofing and internal painting and other projects should be basically completed, the relevant foundation floor and channel should be completed, and the concrete strength should not exceed 75% of the design strength; the installation and construction sites and nearby debris, garbage, etc. should be eliminated and cleaned.
When the warehouse racking and shelving are assembled, the components should be validated one by one, and the components are size checked. The construction scope is delineated according to the plan view and the axis, edge line and elevation line of the building. Determine the baseline position and draw lines based on this baseline.
The vertical column can be assembled by a manual (pulley, etc.), mechanical (car crane, etc.) according to the height and weight of the column, and equipped with a certain total number of beams to form a stable structure. After erecting warehouse racking solutions, the number of rows will be counted, and the orientation and size will be checked according to the figure, and the initial adjustment of elevation, vertical and horizontal will be carried out. If other accessories are installed, the data will be installed one by one, so that the data can reach the standard and then be installed column by column.
Face the shelf as a whole, horizontal and vertical adjustment until the standard is met. Test the deflection under the beam. For the presence of a stacker or forklift, a cross-border test should be performed. Any fastener shall be tightened, and the bolt shall leak out the nut by 2-4 pitches; after the countersunk screw is tightened, the countersunk head shall be buried in the member and shall not be exposed.